Text by Yang Zhongxin from Shanxian County Water Plant
On July 14, 2020, Shanxian County Water Plant organized all staff to carry out an emergency drill for flood control by combining priorities of flood control with its actual situation.
Currently, as Shanxian has entered the flood season, preventing security incidents and ensuring the normal operation of the Plant has become the top priority of the Shanxian County Water plant. In consideration of any possible flood disaster, Shanxian County Water Plant has made plans ahead and conducted the emergency drill regarding flood control emergency response to rainwater intrusion into the switching room caused by the sudden rainfall. According to the emergency plan, the drill included property rescue, blocking off flood with flood control sandbags, pumping water via dewatering pump and other links.
Through the drill, all staff have enhanced awareness of flood control and will carry out the emergency rescue of flood control in a quicker, more orderly and efficient manner.